mine · Mongolia

Oyu Tolgoi

A giant copper-gold operation whose underground block cave makes it a top-five global copper mine.

OperatingUnderground ramp-upProject score 82
Operator
Rio Tinto
Country
Mongolia
Mine life
35 yrs
Capex
$7.0B
Profile

Resource, economics and jurisdiction

Resource
Very large copper-gold porphyry resource with decades of mine life.
Production
Rising toward 500 kt of copper annually from the underground.
Economics
Long life and rising grade profile through the 2030s.
Infrastructure
Dedicated power import lines, sealed road and airstrip in the Gobi.
Jurisdiction
Moderate risk
Ownership
Rio Tinto 66%, Government of Mongolia 34%
Region
South Gobi
Overview

What this asset is

A giant copper-gold operation whose underground block cave makes it a top-five global copper mine.

Methodology

Earthern Project Score 82

Version v0.1

Resource Quality
83 (weight 1.2) — Grade, continuity and metallurgical complexity of the resource.
Project Scale
91 (weight 1) — Annual output potential relative to the global market for its primary mineral.
Development Stage
80 (weight 0.9) — How far the asset has advanced toward or through production.
Jurisdiction
86 (weight 1.1) — Political stability, permitting predictability and rule of law.
Infrastructure
85 (weight 0.9) — Access to power, water, transport and processing capacity.
Economics
82 (weight 1.2) — Cost position and margin resilience through the price cycle.
Strategic Importance
86 (weight 1) — Relevance to national critical mineral strategies and allied supply chains.
Supply-Chain Value
82 (weight 1) — Whether the asset relieves a genuine downstream bottleneck.
Sustainability
80 (weight 0.9) — Carbon intensity, water use, tailings approach and community standing.
Execution Risk
74 (weight 1) — Technical, financing and schedule risk to reaching nameplate output. Higher is lower risk.
Materials

Minerals produced

Assets

Related assets