mine · Indonesia

Grasberg

A giant copper-gold complex transitioning from open pit to large-scale block cave mining.

OperatingProduction
Grasberg mine landscape

Earthern Project Score

85 / 100

Operator
Freeport-McMoRan
Country
Indonesia
Mine life
20 yrs
Capex
—
Profile

Resource, economics and jurisdiction

Resource
One of the largest combined copper and gold resources ever discovered.
Production
Roughly 750 kt copper and significant gold output annually.
Economics
Exceptional by-product gold credits support very low net copper cost.
Infrastructure
Integrated smelter at Gresik, aerial tramways and dedicated power.
Jurisdiction
Moderate risk
Ownership
Freeport 48.8%, MIND ID 51.2%
Region
Papua
Overview

What this asset is

A giant copper-gold complex transitioning from open pit to large-scale block cave mining.

Methodology

Earthern Project Score 85

Version v0.1

Resource Quality
92 (weight 1.2) — Grade, continuity and metallurgical complexity of the resource.
Project Scale
93 (weight 1) — Annual output potential relative to the global market for its primary mineral.
Development Stage
80 (weight 0.9) — How far the asset has advanced toward or through production.
Jurisdiction
85 (weight 1.1) — Political stability, permitting predictability and rule of law.
Infrastructure
83 (weight 0.9) — Access to power, water, transport and processing capacity.
Economics
82 (weight 1.2) — Cost position and margin resilience through the price cycle.
Strategic Importance
94 (weight 1) — Relevance to national critical mineral strategies and allied supply chains.
Supply-Chain Value
88 (weight 1) — Whether the asset relieves a genuine downstream bottleneck.
Sustainability
83 (weight 0.9) — Carbon intensity, water use, tailings approach and community standing.
Execution Risk
81 (weight 1) — Technical, financing and schedule risk to reaching nameplate output. Higher is lower risk.
Materials

Minerals produced

Assets

Related assets