mine · Indonesia

Grasberg

A giant copper-gold complex transitioning from open pit to large-scale block cave mining.

OperatingProductionProject score 85
Operator
Freeport-McMoRan
Country
Indonesia
Mine life
20 yrs
Capex
Profile

Resource, economics and jurisdiction

Resource
One of the largest combined copper and gold resources ever discovered.
Production
Roughly 750 kt copper and significant gold output annually.
Economics
Exceptional by-product gold credits support very low net copper cost.
Infrastructure
Integrated smelter at Gresik, aerial tramways and dedicated power.
Jurisdiction
Moderate risk
Ownership
Freeport 48.8%, MIND ID 51.2%
Region
Papua
Overview

What this asset is

A giant copper-gold complex transitioning from open pit to large-scale block cave mining.

Methodology

Earthern Project Score 85

Version v0.1

Resource Quality
92 (weight 1.2) — Grade, continuity and metallurgical complexity of the resource.
Project Scale
93 (weight 1) — Annual output potential relative to the global market for its primary mineral.
Development Stage
80 (weight 0.9) — How far the asset has advanced toward or through production.
Jurisdiction
85 (weight 1.1) — Political stability, permitting predictability and rule of law.
Infrastructure
83 (weight 0.9) — Access to power, water, transport and processing capacity.
Economics
82 (weight 1.2) — Cost position and margin resilience through the price cycle.
Strategic Importance
94 (weight 1) — Relevance to national critical mineral strategies and allied supply chains.
Supply-Chain Value
88 (weight 1) — Whether the asset relieves a genuine downstream bottleneck.
Sustainability
83 (weight 0.9) — Carbon intensity, water use, tailings approach and community standing.
Execution Risk
81 (weight 1) — Technical, financing and schedule risk to reaching nameplate output. Higher is lower risk.