project · Argentina

Josemaria

A large copper-gold development in the Vicuna district of the high Andes.

ConstructionConstructionProject score 74
Operator
Independent
Country
Argentina
Mine life
19 yrs
Capex
$4.0B
Profile

Resource, economics and jurisdiction

Resource
Substantial copper-gold-silver resource within a larger district.
Production
Planned output of around 130 kt copper annually in early years.
Economics
Improved by Argentinas new large investment incentive regime.
Infrastructure
High-altitude access roads and dedicated power line required.
Jurisdiction
Moderate risk
Ownership
Lundin Mining / BHP joint venture
Region
San Juan
Overview

What this asset is

A large copper-gold development in the Vicuna district of the high Andes.

Methodology

Earthern Project Score 74

Version v0.1

Resource Quality
76 (weight 1.2) — Grade, continuity and metallurgical complexity of the resource.
Project Scale
81 (weight 1) — Annual output potential relative to the global market for its primary mineral.
Development Stage
70 (weight 0.9) — How far the asset has advanced toward or through production.
Jurisdiction
75 (weight 1.1) — Political stability, permitting predictability and rule of law.
Infrastructure
75 (weight 0.9) — Access to power, water, transport and processing capacity.
Economics
72 (weight 1.2) — Cost position and margin resilience through the price cycle.
Strategic Importance
74 (weight 1) — Relevance to national critical mineral strategies and allied supply chains.
Supply-Chain Value
79 (weight 1) — Whether the asset relieves a genuine downstream bottleneck.
Sustainability
73 (weight 0.9) — Carbon intensity, water use, tailings approach and community standing.
Execution Risk
75 (weight 1) — Technical, financing and schedule risk to reaching nameplate output. Higher is lower risk.
Materials

Minerals produced

Assets

Related assets