mine · Indonesia

Weda Bay

One of the largest nickel operations globally, anchoring an integrated industrial park.

OperatingExpansionProject score 70
Operator
Independent
Country
Indonesia
Mine life
30 yrs
Capex
Profile

Resource, economics and jurisdiction

Resource
Very large nickel laterite resource.
Production
Very high ore output feeding on-site NPI and HPAL capacity.
Economics
Very low cash cost; carbon intensity is the principal criticism.
Infrastructure
Captive coal power and a dedicated industrial park with port.
Jurisdiction
Moderate risk
Ownership
Eramet and Tsingshan joint venture
Region
Halmahera
Overview

What this asset is

One of the largest nickel operations globally, anchoring an integrated industrial park.

Methodology

Earthern Project Score 70

Version v0.1

Resource Quality
78 (weight 1.2) — Grade, continuity and metallurgical complexity of the resource.
Project Scale
75 (weight 1) — Annual output potential relative to the global market for its primary mineral.
Development Stage
76 (weight 0.9) — How far the asset has advanced toward or through production.
Jurisdiction
69 (weight 1.1) — Political stability, permitting predictability and rule of law.
Infrastructure
69 (weight 0.9) — Access to power, water, transport and processing capacity.
Economics
66 (weight 1.2) — Cost position and margin resilience through the price cycle.
Strategic Importance
73 (weight 1) — Relevance to national critical mineral strategies and allied supply chains.
Supply-Chain Value
73 (weight 1) — Whether the asset relieves a genuine downstream bottleneck.
Sustainability
61 (weight 0.9) — Carbon intensity, water use, tailings approach and community standing.
Execution Risk
70 (weight 1) — Technical, financing and schedule risk to reaching nameplate output. Higher is lower risk.
Materials

Minerals produced

Assets

Related assets