mine · Indonesia

Sorowako

A long-established nickel laterite mining and smelting operation.

OperatingProduction
Sorowako mine landscape

Earthern Project Score

72 / 100

Operator
Vale
Country
Indonesia
Mine life
25 yrs
Capex
—
Profile

Resource, economics and jurisdiction

Resource
Large laterite nickel resource.
Production
Around 70 kt of nickel in matte annually.
Economics
Hydro power gives a lower carbon and cost profile than coal-fired peers.
Infrastructure
Hydroelectric power supply and integrated smelter.
Jurisdiction
Moderate risk
Ownership
PT Vale Indonesia
Region
Sulawesi
Overview

What this asset is

A long-established nickel laterite mining and smelting operation.

Methodology

Earthern Project Score 72

Version v0.1

Resource Quality
71 (weight 1.2) — Grade, continuity and metallurgical complexity of the resource.
Project Scale
71 (weight 1) — Annual output potential relative to the global market for its primary mineral.
Development Stage
66 (weight 0.9) — How far the asset has advanced toward or through production.
Jurisdiction
70 (weight 1.1) — Political stability, permitting predictability and rule of law.
Infrastructure
68 (weight 0.9) — Access to power, water, transport and processing capacity.
Economics
76 (weight 1.2) — Cost position and margin resilience through the price cycle.
Strategic Importance
75 (weight 1) — Relevance to national critical mineral strategies and allied supply chains.
Supply-Chain Value
80 (weight 1) — Whether the asset relieves a genuine downstream bottleneck.
Sustainability
72 (weight 0.9) — Carbon intensity, water use, tailings approach and community standing.
Execution Risk
69 (weight 1) — Technical, financing and schedule risk to reaching nameplate output. Higher is lower risk.
Materials

Minerals produced

Assets

Related assets