mine · Indonesia

Sorowako

A long-established nickel laterite mining and smelting operation.

OperatingProductionProject score 72
Operator
Vale
Country
Indonesia
Mine life
25 yrs
Capex
Profile

Resource, economics and jurisdiction

Resource
Large laterite nickel resource.
Production
Around 70 kt of nickel in matte annually.
Economics
Hydro power gives a lower carbon and cost profile than coal-fired peers.
Infrastructure
Hydroelectric power supply and integrated smelter.
Jurisdiction
Moderate risk
Ownership
PT Vale Indonesia
Region
Sulawesi
Overview

What this asset is

A long-established nickel laterite mining and smelting operation.

Methodology

Earthern Project Score 72

Version v0.1

Resource Quality
71 (weight 1.2) — Grade, continuity and metallurgical complexity of the resource.
Project Scale
71 (weight 1) — Annual output potential relative to the global market for its primary mineral.
Development Stage
66 (weight 0.9) — How far the asset has advanced toward or through production.
Jurisdiction
70 (weight 1.1) — Political stability, permitting predictability and rule of law.
Infrastructure
68 (weight 0.9) — Access to power, water, transport and processing capacity.
Economics
76 (weight 1.2) — Cost position and margin resilience through the price cycle.
Strategic Importance
75 (weight 1) — Relevance to national critical mineral strategies and allied supply chains.
Supply-Chain Value
80 (weight 1) — Whether the asset relieves a genuine downstream bottleneck.
Sustainability
72 (weight 0.9) — Carbon intensity, water use, tailings approach and community standing.
Execution Risk
69 (weight 1) — Technical, financing and schedule risk to reaching nameplate output. Higher is lower risk.
Materials

Minerals produced