mine · Australia

Pilgangoora

A large spodumene operation supplying conversion capacity across Asia.

OperatingProductionProject score 79
Operator
Pilbara Minerals
Country
Australia
Mine life
25 yrs
Capex
Profile

Resource, economics and jurisdiction

Resource
Large lithium-tantalum pegmatite resource.
Production
Roughly 700 kt of spodumene concentrate annually at expanded capacity.
Economics
Cost position improves with scale but is above Greenbushes.
Infrastructure
Sealed haul road to Port Hedland; gas and solar hybrid power.
Jurisdiction
Very low risk
Ownership
Pilbara Minerals 100%
Region
Pilbara, Western Australia
Overview

What this asset is

A large spodumene operation supplying conversion capacity across Asia.

Methodology

Earthern Project Score 79

Version v0.1

Resource Quality
83 (weight 1.2) — Grade, continuity and metallurgical complexity of the resource.
Project Scale
76 (weight 1) — Annual output potential relative to the global market for its primary mineral.
Development Stage
85 (weight 0.9) — How far the asset has advanced toward or through production.
Jurisdiction
77 (weight 1.1) — Political stability, permitting predictability and rule of law.
Infrastructure
81 (weight 0.9) — Access to power, water, transport and processing capacity.
Economics
84 (weight 1.2) — Cost position and margin resilience through the price cycle.
Strategic Importance
84 (weight 1) — Relevance to national critical mineral strategies and allied supply chains.
Supply-Chain Value
80 (weight 1) — Whether the asset relieves a genuine downstream bottleneck.
Sustainability
82 (weight 0.9) — Carbon intensity, water use, tailings approach and community standing.
Execution Risk
72 (weight 1) — Technical, financing and schedule risk to reaching nameplate output. Higher is lower risk.
Materials

Minerals produced

Assets

Related assets